For the week of July 13th to July 17th –
Crews will be working from Main Street to East Highland Drive.
o Martell Construction will continue to be pour sidewalk along the west side of WIS 22 up to Main Street. They will be completing sidewalk ramps at various intersections and continuing to pour driveways along both sides of WIS 22. Residence will need to anticipate temporary driveway closures during each individual driveway pour.
o Vinton Construction will continue to pour out intersections and railroad approaches. This will limit access onto the site at Franklin north, Washington north, Adams north and Jefferson north. Due to today’s concrete mainline pour, access will be closed to WIS 22 from Franklin south, Washington south and Adams south until opening strengths have been achieved.
o The railroad crossing will remain closed the entire week.
o Peters Concrete will continue to grade for sidewalks and the railroad approaches. Crews will start to place topsoil between the curb and sidewalk as well as on the backsides of the sidewalk.
o Van Buren Street, Paul Street, Columbia Street and Chestnut Street will be opened to allow for local traffic only. It will still be signed as “Road Closed to Through Traffic”.