Construction Update for July 20th to July 24th

For the week of July 20th to July 24th –
· Crews will be working from Main Street to East Highland Drive.
o Martell Construction will continue to pour sidewalk along both sides of WIS 22 from Main Street to the railroad crossing. They will be completing sidewalk ramps at various intersections and continuing to pour driveways along both sides of WIS 22. Residence will need to anticipate temporary driveway closures during each individual driveway pour.
o Vinton Construction will continue to complete the colored crosswalks from Franklin Street to Jefferson Street both on the south and north sides of WIS 22.
o The railroad crossing will be reopened as soon as this Friday, but no later than Monday July 20th.
o Peters Concrete will continue to grade for sidewalks. Crews will start to place topsoil between the curb and sidewalk as well as on the backsides of the sidewalk.
o Van Buren Street, Paul Street, Grove Street, Columbia Street, Chestnut Street will be opened to allow for local traffic only. Jefferson Street, Adams Street, Washington Street and Franklin Street will be opened to allow for local traffic only in the later part of the week after strengths have been achieved for the concrete. All side streets will still be signed as “Road Closed to Through Traffic”.
· The schedule is subject to change due to unforeseen conflicts and/or weather events.”